Tohoku Electric restarts thermal power plant after replacing pipe
Tohoku Electric restarted the operation of its No. 2 power generator at its thermal plant in the city of Akita after replacing a cracked pipe connecting the boiler to the turbine.
The 350,000-kilowatt generator was shut down after steam was found leaking through the crack. Regular operation
was resumed after replacing the pipe and having confirmed its safety.
The full story is available at Kyodo News.