Power Utility
Global coal demand seen to remain steady through 2025
This was despite the expansion of renewable energy.
Global coal demand seen to remain steady through 2025
This was despite the expansion of renewable energy.
China’s solar dominance shines bright in energy development
Beijing is projected to exceed its target of 200GW additional solar and wind capacity this year.
Coal demand in India to reach 1.5 billion tonnes by 2029-2030
Currently, there is a gap between demand and supply.
India requires $100B to decarbonize heavy industries
Investment in renewable energy is crucial to meet decarbonization goals by 2030.
Bold action required to fully tap Japan’s RE growth potential
RE100 urges Japan to increase its green energy capacity to 363GW by 2035.
Tata Power sets FY 2025 capex to $2.44b for renewables expansion
This will also fund transmission and distribution businesses.
Manila starts second round for selection of microgrid provider
This will cover 75 unserved and underserved areas.
ADB backs Sri Lanka’s power reforms with $100m loan
Another $1m technical assistance will also be granted.
South Korea’s nuclear generation share to reach 30.3% by 2030
It is slightly behind the 32.4% target.
Will Malaysia reach its 2035 renewable energy target?
Data from GlobalData indicates it will fall slightly short of the 40% target.
India to account for 3% of APAC’s offshore wind capacity between 2024-2033
This is in line with its Viability Gap Funding scheme for offshore wind plants.
China to account for half of 4.7 TWdc solar capacity addition between 2024 and 2023
It is also seen to lead the wind power and energy storage market.
South Korea eyes 6GW solar power annual distribution in industrial areas
It hopes to achieve this by 2030.
Philippines renewable energy eyes 22.6% annual increase
Government incentives and foreign investments drive the growth.
Horizon Power taps GHD for Pilbara Green Link project
Preliminary engineering phase will be completed next year.
Shandong Liaocheng Power Supply rolls out supply measures amidst higher summer demand
Peak midday load is seen to reach 6.03 million kilowatts.
NTPC’s generation up 9.5% in Q1 FY25
Coal despatch also grew 17.15%.